The Price of Protection: What Does Surge Protection Really Cost?
When construction budgets are under pressure, every line item comes under scrutiny.
Electrical systems are no exception. Value engineering can mean finding ways to reduce equipment costs, simplify specifications or defer certain investments. On paper, the savings can look attractive.
But what happens when the cost-saving decision creates a much larger operating expense down the road?
Surge protection is a great example.
The price of installing an adequate Surge Protective Device (SPD) is relatively small when compared with the potential cost of electrical failures, equipment damage, troubleshooting, downtime and ongoing maintenance over the life of a building.
And that is why the conversation about surge protection should go beyond the initial purchase price.
The Cost of Saving on Protection
Recently, Innosys Power became aware of three separate catastrophic electrical failures at facilities in southern Ontario: a police station, a school and a healthcare facility.
While each situation was different, a common factor was inferior or inadequate surge protection.
In one case, SPD protection had been reduced or omitted as part of the original project’s cost-saving decisions.
The result?
The owner began experiencing electrical-related maintenance issues within the first year of operation and is now looking at adding SPDs to a future capital budget to address the problem.
Based on the maintenance costs already incurred, the additional SPD investment is expected to be recovered in less than a year.
That changes the economics of the original decision considerably.
A saving made during construction has effectively become a new expense for the owner.
Initial Cost vs. Total Cost of Ownership
This is where the distinction between initial cost and total cost of ownership becomes important.
A building isn’t designed to operate for one year. Commercial, institutional and industrial facilities can be expected to serve their owners and occupants for decades.
Over a 30-year building life, even relatively modest electrical problems can add up.
Consider the potential costs associated with a recurring electrical issue:
- Service calls and diagnostic work
- Replacement of sensitive electronic equipment
- Labour and troubleshooting
- Equipment downtime
- Disruption to building operations
- Emergency repairs
- Additional maintenance requirements
- Premature replacement of electrical equipment
The original SPD cost can look very different when viewed against that potential long-term expense.
A relatively small saving during construction may ultimately become a much larger operating cost.
Who Pays for the Saving?
There is also an important distinction between who makes a construction cost decision and who lives with the consequences.
Contractors are understandably focused on delivering a project within the contract value. When opportunities arise to reduce construction costs, those savings can be important to the project.
But the owner has a different perspective.
They have to operate the building for the next 10, 20 or 30 years.
When infrastructure fails, the toll extends far beyond physical facilities. Communities suffer, and human lives are directly affected—at best inconvenienced, and at worst put in harm’s way.
That makes the engineer’s role particularly important. Engineers are in a position to look beyond the initial construction budget and consider what a particular design decision could mean for the owner’s long-term operating and maintenance costs, and for the wellbeing of the people in the facility.
This isn’t an argument for specifying the most expensive electrical solution.
It is an argument for specifying the right solution for the application and evaluating its value over the life of the building.
The Real Price of an SPD
The better question isn’t simply:
“How much does the SPD cost?”
It is:
“What does it cost not to protect the electrical system adequately?”
That calculation needs to consider more than the price of the equipment.
An effective surge protection strategy can help protect electrical and electronic equipment from transient events and reduce the potential for damage and disruption. When properly designed as part of the building’s electrical system, the value of that protection extends well beyond the initial installation.
At Innosys Power, our approach is to look at surge protection from that lifecycle perspective.
Our Total Protection Solutions™ SPDs are backed by an up-to 30-year warranty, providing protection designed to remain part of the electrical infrastructure over the long term.
The goal isn’t simply to sell an SPD.
It is to help engineers, contractors and owners understand the relationship between protection, reliability, maintenance and lifecycle cost.
The Lowest Construction Cost Isn’t Always the Lowest Cost
The lesson from these recent failures is straightforward.
Saving money during construction isn’t necessarily the same thing as saving money.
If an electrical protection measure is removed or reduced to lower the initial project cost, the owner may eventually pay for that decision through maintenance, equipment replacement, downtime and additional capital expenditures.
In some cases, the cost of adding adequate surge protection after the fact can be recovered in less than a year.
When the building is expected to operate for another 29 years, that is a very different financial equation.
The most cost-effective electrical design isn’t necessarily the one with the lowest construction price.
It may be the one that gives the owner the lowest total cost of ownership over the life of the building.
That’s the conversation Innosys Power wants to have.